JETRAY / Battery engineering & sourcingShenzhen, China[email protected] ↗
JETRAYCoin Cell BatteriesBlog
BLOG & TECHNICAL GUIDES

A working library for better specifications.

Practical reading about selection, integration and purchasing. Each guide includes source references and connects to a relevant project discussion.

Engineering workspace published on the Jetray website
FEATURED BLOG GUIDE / SMALL-FORMAT PRIMARY POWER

Coin-Cell Sleep Current: Find the Missing Microamps

Locate unexpected current in a coin-cell device by separating measurement artifacts, firmware events, external power paths and component leakage.

Read the featured guide ↗
6 original guides · Jetray editorial team · Updated 5 November 2026
Choose a reading path

Find the question that matches your project.

The Blog connects practical product selection with integration and purchasing decisions.

Start here when…Consider these questionsRead next
You are defining the requirement.Define the symptom in charge per event · Verify that the instrument is observing the intended circuitCoin-Cell Sleep Current: Find the Missing Microamps
You are integrating a configuration.Draw power states as well as a nominal schematic · Use the primary-cell manufacturer's isolation guidancePrimary Coin Cells: Find Reverse-Current Paths
You are preparing an RFQ or evaluation.Define which function must survive the lowest voltage · Allocate a voltage-drop budget before choosing a capacitorCoin-Cell Cutoff and Capacitors: Avoid Brownout Loops
A useful conversation starts with a specification

Tell us what your equipment needs.

Share the load, dimensions and intended use. Ask for a current model specification and a project review.

Discuss your project

Product comparison